The industrial park has grown once again. After a construction period of just 12 months, two new halls were handed over to the future tenants on schedule.
The two new halls offer more than 13,000 m² of state-of-the-art floor space. Dimmable LED lighting with motion detectors in all areas ensures maximum energy efficiency at low power consumption. The heat pump air conditioning systems ensure comfortable working conditions and precise temperature control of the stored goods both in winter and summer.
The ideal transport links between the location and the main road and motorway as well as 24/7 surveillance are further decisive advantages.
The Managing Director of the Willstätt Industrial Park, Alexander Reichert, summarises it in one sentence: "Versatile hall space was created in the greater Strasbourg/Ortenau area, which also impresses demanding customers."